TESTIMONIAL: OIL AND GAS

PREVENTING COSTLY DOWNTIME WITH VARTECH® ISC

TESTIMONIAL: OIL AND GAS

PREVENTING COSTLY DOWNTIME WITH VARTECH® ISC

Caltex VARTECH® ISC removed high build-up of varnish in Chevron Thailand’s offshore CPP compressor, improving heat transfer, reducing contaminants, and preventing costly downtime.

Caltex VARTECH® ISC removed high build-up of varnish in Chevron Thailand’s offshore CPP compressor, improving heat transfer, reducing contaminants, and preventing costly downtime.

Pipes in a manufacturing facility

PROOF OF PERFORMANCE

PROOF OF PERFORMANCE

Varnish icon
EFFECTIVE VARNISH REMOVAL

VARTECH® ISC successfully removed the build-up of varnish, restoring system cleanliness and improving operational efficiency without disrupting offshore platform performance.

Contamination icon
REDUCTION IN CONTAMINANTS

After implementing VARTECH® ISC, insoluble MPC levels dropped from 71 to 27 (∆E), demonstrating the product's effectiveness in solubilizing the varnish present.

Heat icon
IMPROVED HEAT TRANSFER

After implementing VARTECH® ISC, temperatures improved almost immediately, resulting in improved heat transfer across the bearing and lowering the overall temperature by 15°F (~9°C), with no further spikes reported after application.

INDUSTRY

Oil and Gas

 

COMPANY

Chevron Thailand Exploration and Production, Ltd

 

LOCATION

North Pailin CPP, Gulf of Thailand

 

APPLICATION

Centrifugal compressor on an offshore central processing platform

 

EQUIPMENT

Power Turbine: Siemens RT-56M

Compressor: Dresser Rand D10R8-7B

Gearbox: MAAG SG 470/4

 

INDUSTRY

Oil and Gas

 

COMPANY

Chevron Thailand Exploration and Production, Ltd

 

LOCATION

North Pailin CPP, Gulf of Thailand

 

APPLICATION

Centrifugal compressor on an offshore central processing platform

 

EQUIPMENT

Power Turbine: Siemens RT-56M

Compressor: Dresser Rand D10R8-7B

Gearbox: MAAG SG 470/4

 

DOWNLOAD FULL TESTIMONIAL
North Pailin map

THE CHALLENGE

 

The offshore CPP experienced an unusual spike in temperature to the thrust bearing of the power turbine unit due to heavy varnish build-up in the compressor oil, risking costly downtime and loss of operational efficiency.

 

OUR SOLUTION

 

Caltex recommended VARTECH® Industrial System Cleaner (ISC) to remove varnish build-up, followed by switching to GST Advantage® RO 32 with VARTECH® Technology and implementing LubeWatch monitoring.

THE CHALLENGE

 

The offshore CPP experienced an unusual spike in temperature to the thrust bearing of the power turbine unit due to heavy varnish build-up in the compressor oil, risking costly downtime and loss of operational efficiency.

 

OUR SOLUTION

 

Caltex recommended VARTECH® Industrial System Cleaner (ISC) to remove varnish build-up, followed by switching to GST Advantage® RO 32 with VARTECH® Technology and implementing LubeWatch monitoring.

Caltex Vartech industrial system cleaner

 

VARTECH® INDUSTRIAL SYSTEM CLEANER (ISC)

Caltex drum

 

GST ADVANTAGE® RO 32
 

Man writing on clipboard

 

LUBEWATCH OIL 
MONITORING SERVICES

VARTECH® ISC was added to the system at 10% capacity, effectively dissolving and removing varnish deposits without the need for downtime, restoring optimal system performance.

The turbine oil was replaced with GST Advantage® RO 32, formulated with VARTECH® Technology to inhibit varnish formation and ensure long-term reliability and efficiency.

Regular oil analysis through the Caltex LubeWatch program tracked varnish reduction, monitored oil condition, and ensured consistent performance, preventing future temperature-related issues.